Construction
Construction division of GIS International Group is based out of Noviy Urengoy.
- Novozapolyarny Settlement for 3,500 people at the Zapolyarny Gas-Oil-Condensate Deposit.
- Residential building with 54 residences in the town of Pavlovka, Republic of Bashkortostan.
- 150-bed hostel with a general store in the town of Gubkinsky.
- 196-bed hostel in the town of Gubkinsky.
- 9-story residential tower in Noviy Urengoy.
- Gas-Oil-Condensate Deposit for 300 people in Noviy Urengoy.
- 154 bed hostel with fitness and cultural facility in the UKPG neighborhood 9.
- 154 bed hostel with fitness and cultural facility in the UKPG neighborhood 9,13, and 15.
- Residential camp with a hotel with 15 sleeping spaces and two 154-bed hostel with a fitness facility.
- Departure Lounge for 70 passengers near Noviy Urengoy Airport.
- Dormitory for 40 beds. Dormitory for 71 beds
Real Estate Development
Sport and cultural complex with engineering facilities at the Novozapolyarny Settlement for 3,500 people, at the Zapolyarny Oil-Gas-Condensate Deposit

Presently the construction is under way. The project is scheduled to be completed in 2009.
Residential buildings in cities and towns near different oil and Gas-Oil-Condensate deposits

- Residential buildings for 150 and 196 apartments in the city of Gubkinskiy.
- 154 bed hostel with fitness and cultural facility.
- 100 bed hostel on the compression station “ Shatrovsky ”.
Hotel “Polet” with 43 rooms near the airport in Noviy Urengoy

- 11 luxury rooms.
- 17 double occupancy rooms.
- 15 single occupancy rooms.
Restaurant and bar built for the convenience of the guests.
9-story residential tower in Noviy Urengoy

One sectional building, 9 residential floors with climate controlled basement and attic. Floor to Ceiling height of each floor is 3 meters.
45 residences in the building, including:
- 9 one bedroom homes (44,8 m ).
- 9 two bedroom homes (77,9 m ).
- 27 three bedroom homes (between 102,5 m and 105,5 m ).
Separate bathrooms. Kitchen area between 10,9 m and 16,3 m. Building was built in 11 months.
Residential camp at Gas-Oil-Condensate Deposit for 300 people in Noviy Urengoy

This contemporary and nicely designed complex consists of:
- Two 4-story dormitories.
- Fitness facility.
- Department store.
Zapolyarny Gas-Oil-Condensate Deposit

This construction was performed from “zero”, where there were no roads, or any infrastructure or engineering facilities.
From 1997 the following has been built:
- two residential modules, each for 956 people, with a sport-and-leisure block.
- three 118-bed hostels.
- two houses each with 24 apartments.
- sauna and laundry facility.
- bank with additional office for the Noviy Urengoy Bran.ch of Zapsibcombank.
- Power distribution unit – 6.
- Two hostels, one with 100, the other with 104 beds.
Sport and cultural complex is under construction.
Vyngayakhinsk Gas-Oil-Condensate Deposit

This site was built to a very tight schedule (10 months).
The complex includes:
- Two 154-bed hostels.
- 15-bed hotel.
- Sport-and-leisure block with connecting galleries.